Skip to main content

Operation Of Polarimeter

To lay down the procedure for operation of polarimeter. This SOP is applicable for polarimeter in Quality control department. Connect the instrument to 230 volts A/C power supply. Ensure the lid is closed.
Switch on the instrument. Instrument initializing is displayed in the screen. After initialization of instrument select the lamp. Select and Press Na/Hal or Hg button, automatically lamp will be on. Wait for 10 minutes (Lamp warming).
Polarimeter, Normal aperture, concentration, integration, instrument
ich

Comments

Popular posts from this blog

OFLOTAL - OR

Ofloxacin - 200mg + Orinidazole-500mg, Model of pack:10x10's, Packing:BlisterOfloxacin - 200mg + Orinidazole-500mg, OFLOTAL - OR TABLETS

Procedure for Inward Material Entries at Security

As soon as a Raw / Packing material consignment arrives at the factory gate, security personnel shall confirm that the material Security shall confirm the place of delivery from the concerned warehouse. Security shall send the documents to the concerned warehouse. Upon receipt of the documents warehouse shall check and ensure the following: Material is for Purchase order exists for the supply. Whether the vendor is approved vendor or not. Certificate of Analysis is enclosed. Invoice / Delivery challan is enclosed. Packing list, if any Lorry Receipt, if any Relevant Excise documents, if any In case of any discrepancy, warehouse shall contact purchase department to resolve the issue. Upon resolving the issue, warehouse shall instruct the security department to allow the material to allow the material inside. Security shall enter the details in the concerned area material inward register as per format no.  xxxxx Security shall put an inward stamp on the back side of the Invoice /...

CARBORIN Z

Carbonyl Iron-100mg+FolicAcid-0.5mg+B12-mcg+Zinc 61.8mg, Model of pack:5x3x10's, Packing:Blister Carbonyl Iron-100mg +FolicAcid-0.5mg+B12-mcg+Zinc 61.8mg, CARBORIN - Z CAPSULES