Skip to main content

Replacement of coupling bolts of reactors

To describe a standard operating procedure for replacement of coupling bolts of reactors. The standard operating procedure describes in detail the method of replacing coupling bolts of reactors.
The responsibility of replacing the coupling bolts of reactors lies with the staff of rank not lower than junior utility operator of maintenance department. The responsibility of preparing, reviewing and approving the standard operating procedure lies with the Manager - Maintenance, Head of Production and Head of QAD respectively.
Coupling bolts of reactors, Engineering, coupling guard
ich

Comments

Popular posts from this blog

OFLOTAL - OR

Ofloxacin - 200mg + Orinidazole-500mg, Model of pack:10x10's, Packing:BlisterOfloxacin - 200mg + Orinidazole-500mg, OFLOTAL - OR TABLETS

CARBORIN Z

Carbonyl Iron-100mg+FolicAcid-0.5mg+B12-mcg+Zinc 61.8mg, Model of pack:5x3x10's, Packing:Blister Carbonyl Iron-100mg +FolicAcid-0.5mg+B12-mcg+Zinc 61.8mg, CARBORIN - Z CAPSULES

Table of contents (toc) for republic of uzbekistan

Table of contents for dossier requirments (republic of uzbekistan). Toc for republic of uzbekistan , toc formate for dossier