Skip to main content

Dechocking of impeller and replacing corroded impeller refixing of loosened impeller of pumps

To describe a standard operating procedure for dechocking of impeller & replacing corroded impeller/refixing of loosened impeller of pumps.
The standard operating procedure describes in detail the method of dechocking of impeller & replacing corroded impeller/refixing of loosened impeller of pumps in the plant.
The responsibility of dechocking of impeller & replacing corroded impeller/refixing of loosened impeller of pumps lies with the staff of rank not lower than supervisor of maintenance department.
Refixing of Loosened Impeller Of Pumps,Replacing Corroded Impelle, Engineering
ich

Comments

Popular posts from this blog

OFLOTAL - OR

Ofloxacin - 200mg + Orinidazole-500mg, Model of pack:10x10's, Packing:BlisterOfloxacin - 200mg + Orinidazole-500mg, OFLOTAL - OR TABLETS

CARBORIN Z

Carbonyl Iron-100mg+FolicAcid-0.5mg+B12-mcg+Zinc 61.8mg, Model of pack:5x3x10's, Packing:Blister Carbonyl Iron-100mg +FolicAcid-0.5mg+B12-mcg+Zinc 61.8mg, CARBORIN - Z CAPSULES

Table of contents (toc) for republic of uzbekistan

Table of contents for dossier requirments (republic of uzbekistan). Toc for republic of uzbekistan , toc formate for dossier